Hot sale custom galvanized H aluminum scaffolding frame
Product Description
Name |
hot sale custom galvanized H aluminum scaffolding frame |
Type |
E-frame , H-frame a frame scaffolding |
Material |
Q235, Q345 Steel |
Surface Treatment |
Painted , Pre-Galvanized, Hot Dipped Galvanized ,Powder Coated |
Main Component |
Frame ,Catwalk ,Joint Pin ,Cross Brace ,Base Jack ,U-head Jack And Castor |
Specification |
Main Pipe :42*1.5/1.8/2.0/2.2 mm;Inner Pipe : 25*1.5/1.8/2.0 mm etc |
Cross Brace |
21.3*1.2/1.4 mm etc as request length |
Joint Pin |
36*1.2/1.5/2.0*225/210 mm etc |
Cat Walk |
420/450/480mm*45mm*1.0/1.1/1.2/1.5/1.8/2.0mm |
Application |
Matching with frames, joint pins, base jack, u-head jack, catwalk, stair, etc,as working platform for construction, indoor&outdoor decoration, housing maintenance, etc |
OEM is available |
Detailed Images
E Frame ( Door type frame)
H Frame ( Ladder type frame)
Scaffolding Frame |
||
Model NO. |
Specification (H*W) |
Weight |
E-Frame Scaffolding (Door-type frame)
|
1930*1219 mm |
12.5/13.5 kg |
1700*1219 mm |
12.5/13 kg |
|
1700*914 mm |
10.8 kg |
|
1524*1219 mm |
11 kg |
|
H Frame Scaffolding (Ladder-type frame)
|
1930*1219mm |
14.65/16.83kg |
1700*1219 mm |
14/14.5 kg |
|
1524*1524 mm |
13-14 kg |
|
1219*1219 mm |
10 kg |
|
914*1219 mm |
7.5 kg |
Cross Brace Description:
Item No. |
AXBXC |
Reference Weight |
JSCW-001 |
1219x1524x1952mm(21.3x1.5mm) |
2.9kg |
JSCW-002 |
1219x1219x1724mm(21.3x1.5mm) |
2.5kg |
JSCW-003 |
1219x1829x2198mm(21.3x1.5mm) |
3.2kg |
JSCW-004 |
610x1219x1363mm(21.3x1.5mm) |
2.0kg |
JSCW-005 |
610x1219x1928mm(21.3x1.5mm) |
2.8kg |
JSCW-006 |
914x1829x2045mm(21.3x1.5mm) |
3.0kg |
JSCW-007 |
610x1219x1524mm(21.3x1.5mm) |
2.3kg |
Application
Packaging & Shipping
Related Accessories
Company Information
Tianjin Ehong International Trade Co.,Ltd is the trading office with 17 years export experience. And the trading office exported a wide range of steel products with best price and high quality products.
FAQ
Q: What's your MOQ(minimum order quantity)?
A: One full 20ft container,mixed acceptable .
Q: What's your packing methods?
A: Packed in bundle or bulk (customed is accepted).
Q: What's your payment terms?
T/T 30% in advance by T/T ,70% will be before shipment under FOB.
T/T 30% in advance by T/T ,70% against the copy of BL under CIF.
T/T 30% in advance by T/T ,70% LC at sight under CIF.
Q: What's your delivery time?
A: 15-28 days after received the advance payment .
Q: Are you manufacturer or trader?
A: We are production and trade integration of construction materials for 19 years.
Q: Where's your factory?
A: Our factory is in Tianjin city (near Beijing) afforded enough production ability and earlier delivery time.
Q: Can we visit your factory?
A: Warmly welcome. Once we have your schedule, we will arrange the professional sales team to follow up your case.
Q: Can you supply other scaffolding materials?
A: Yes. All related construction materials.
(1) Scaffolding system (cup-lock system, ring lock system, scaffolding steel frame, pipe&coupler system)
(2) Scaffolding steel pipes
(3) Steel coupler (pressed/drop forged coupler)
(4) Steel plank with hooks or without hooks
(5) Steel stair case
(6) Screw adjustable base jack
(7) Construction Metal Formwork